Nowak 2025 Project Details
A 2 coat color change on roof as well as a conversion of balcony rails to a cable system.
Scope of Work:
Carpentry:
- Removed Balusters on Balcony
- Removed Bottom rail on Balcony
- Applied wood filler in holes on posts and top rail
- Installed a cable wire rail system
Prep:
- Hand wash roof
- Wire brush down any rust spots on roof
- Sand down handrails
Painting:
- Primed any rusted areas on roof
- Applied 2 Coats of Sher-Cryl™ HPA (High Performance Acrylic) to Roof, Balcony, Fascia, Posts and Top Rail